ADU Construction - New Build
A ground-up ADU is the most flexible option: you choose the size, layout, and finish level. In Los Angeles, a detached ADU can range from a compact 150 sq ft studio to a 1,200 sq ft two-bedroom unit, depending on your lot size and local zoning.
Typical new-build ADU construction in LA runs 12 to 18 months from design to certificate of occupancy, factoring in plan approval, permit review, and construction. The City of LA has streamlined ADU permitting significantly since 2020 - the California Department of Housing and Community Development provides a helpful overview of current ADU law at hcd.ca.gov.
- Site assessment and feasibility review
- Architectural plans and structural engineering
- Full permit procurement with LADBS
- Foundation, framing, MEP rough-in, and finishes
- Final inspections and certificate of occupancy