Los Angeles ADU Contractor

Build an ADU That Works for Your Property

G&M Home Remodeling plans, permits, and builds accessory dwelling units across Los Angeles. We handle the full process from your first site walkthrough to final inspection sign-off.

What We Build

Every ADU Type, One Team

Los Angeles zoning allows several ADU configurations depending on your lot. Here is what we build and what each involves.

01

Detached ADU

A fully separate structure in your backyard. These have no shared walls with the main house, which gives tenants genuine privacy and can command higher rents. Most detached ADUs in LA range from 400 to 1,200 sq ft depending on lot size and setback requirements.

The trade-off: detached builds typically cost more per square foot than conversions because you are pouring a new foundation, running new utilities, and framing from scratch.

02

Garage Conversion ADU

Converting an existing garage is usually the fastest route to a permitted ADU in Los Angeles. The slab is already there. Framing, insulation, electrical, plumbing, and HVAC go in around an existing shell.

Learn about garage conversions
03

Junior ADU (JADU)

A JADU is carved from space already inside your primary residence, up to 500 sq ft. It requires an owner-occupancy covenant recorded with the county, but permitting is simpler than a full ADU and the build cost is significantly lower.

04

Attached ADU

Built onto an existing exterior wall of the home. You get more square footage without a separate foundation, but it does share a wall with the main house. Soundproofing between units is something we specify carefully in these builds.

05

Site Analysis & Custom Design

Before any drawings, we assess lot dimensions, setbacks, existing utility locations, soil conditions, and neighborhood context. This upfront work prevents costly redesigns and keeps your project on budget from day one.

See the full builder guide

ADU Garage Conversion in Los Angeles

Garage conversions are one of the most cost-effective ADU options in LA County. We handle the full scope: framing, insulation, electrical panel upgrades, plumbing rough-in, HVAC, drywall, and finishes. Most conversions are permitted and built within a few months.

Explore ADU Garage Conversion Los Angeles
  • Full permit management
  • Utility connections included
  • Kitchen & bath fit-out
  • Inspections coordinated

How We Work

The Process Behind a Finished ADU

ADU projects in Los Angeles move through city plan check, permit issuance, inspections, and final sign-off. Knowing that sequence in advance is the difference between a project that moves and one that stalls for months.

We carry the permitting load. From preparing construction documents that match LA Department of Building and Safety requirements to scheduling inspections at each phase, we manage the paperwork so you are not chasing the city yourself.

  1. 1

    Site Assessment & Feasibility

    We walk your property and review lot dimensions, setbacks, utility access, and soil conditions. You get a straight answer on what is buildable before any money changes hands.

  2. 2

    Design & Plan Preparation

    We produce construction drawings that address structural, electrical, mechanical, and plumbing requirements. Plans submitted to the city reflect actual site conditions, not generic templates.

  3. 3

    Permit Submittal & Plan Check

    We handle the submission, respond to plan check corrections, and track status through LADBS. If a correction comes back, we address it and resubmit quickly.

  4. 4

    Construction & Inspections

    Work proceeds phase by phase: foundation, framing, rough mechanicals, insulation, drywall, and finishes. We schedule city inspections at each milestone to keep the project moving.

  5. 5

    Final Inspection & Certificate

    The project closes with a final inspection and certificate of occupancy. That document is what makes your ADU legally rentable and insurable.

Permitted. Inspected. Done.

Why Permits Matter on Every ADU

Unpermitted ADUs in Los Angeles cannot be legally rented. If discovered during a property sale, they may need to be demolished or retroactively permitted at significant cost. Lenders and insurers also treat unpermitted structures differently, which can complicate refinancing.

California SB 9 and AB 68 have made ADU permitting more predictable statewide, but Los Angeles still has specific requirements around fire separation, utility connections, and setbacks. Getting it right the first time saves real money.

Architectural blueprints being reviewed on a desk during project planning

"The biggest delays we see on ADU projects come from submitting drawings that do not match site conditions. Inspectors catch it. Corrections take weeks. Getting the survey data right at the start is the single best thing you can do for your schedule."

G&M Home Remodeling, Los Angeles

By the Numbers

ADU Projects in Los Angeles

  • 500Sq Ft

    JADU maximum under California law

  • 1,200Sq Ft

    Typical detached ADU maximum in LA

  • 4ADU Types

    Detached, attached, garage, JADU

  • 0Parking Required

    For ADUs within a half-mile of transit

What Drives ADU Cost in LA

  • Foundation type matters most on detached builds. A raised foundation on difficult soil costs more than a slab on flat ground.
  • Utility run distance from your main panel and water meter to the new unit directly affects cost. Longer runs mean more materials and labor.
  • Finish level is your biggest variable after structure. Entry-level finishes versus mid-range can shift a budget by 15 to 25 percent.
  • City fees in LA vary by zone and square footage. Impact fees were suspended for ADUs under 750 sq ft but apply above that threshold.
See full remodeling cost breakdown

Los Angeles ADU Zoning at a Glance

  • Single-family and multifamily lots are both eligible for ADUs in California
  • Setback minimums for detached ADUs are typically 4 feet from side and rear lot lines
  • Height limits vary by neighborhood and adjacency to single-family zones
  • Deed restriction is required for JADUs, confirming owner-occupancy of the primary home
  • Separate utility meters are allowed but not required on ADUs
Full ADU contractor guide

Common Questions

ADU Questions Answered

These are the questions homeowners ask us most before starting an ADU project in Los Angeles.

How long does an ADU project take in Los Angeles?
Does my ADU need a separate entrance?
Can I rent out my ADU immediately after it is built?
What does the site analysis actually involve?
Can I build an ADU on a lot with an existing rental unit?
Do I need to hire a separate architect?

Start Your Project

Ready to Add an ADU to Your Property?

The first step is a site walkthrough. We assess your lot, review what is buildable under current LA zoning, and give you a clear picture of timeline and cost before anything is committed.

  • Free Site Assessment

    We visit your property and tell you what is buildable under current LA zoning at no cost.

  • Full Permit Management

    From drawings to LADBS submission to inspection scheduling, we handle the paperwork.

  • Turnkey Construction

    One contractor, one contract. Foundation through finishes, all coordinated by G&M.

  • Certificate of Occupancy

    The project is not done until the city signs off and your unit is legally rentable.

G&M Home Remodeling

We work with homeowners across Los Angeles on ADU builds, home additions, and full remodels. If you are weighing an ADU against a room addition or trying to decide which type of ADU fits your lot, that is exactly the kind of conversation we have during the site assessment.

Licensed. Insured. Experienced with Los Angeles building requirements.

Serving Los Angeles County

West Hollywood • Inglewood • Hawthorne • Tarzana • Long Beach • Pasadena