G&M Home Remodeling crew completing a full kitchen remodel in a Sherman Oaks Los Angeles home

CSLB License #1048107

How Much Does a Residential Remodeling Contractor in Los Angeles Cost?

Real numbers. No runaround. G&M Home Remodeling is a family-run contractor based in Sherman Oaks, serving homeowners across greater Los Angeles.

This page breaks down what remodeling actually costs in LA, by project type, permit requirements, and the variables that move the number up or down.

  • FreeEstimates
  • Same-DayCallback
  • LABased
  • Sherman OaksGreater Los Angeles, CA

About G&M Home Remodeling

A Family Business Built on Straight Talk

G&M Home Remodeling is a licensed, insured general contractor operating out of Sherman Oaks. We handle projects from single-room updates to full home additions and ADU builds across Los Angeles, the San Fernando Valley, and surrounding communities.

CSLB License #1048107 covers our work. Every estimate is free, and we aim to return every call the same day. If a project is not a good fit for us, we will tell you rather than take your deposit.

We have guided homeowners through kitchen overhauls, bathroom renovations, room additions, garage conversions, ADU permitting, and pool construction. The work is hands-on and local. If you are comparing contractors in LA, look up each one on the California Contractors State License Board before signing anything.

  • Licensed & Insured
  • Free Estimates
  • Same-Day Callback
  • Family-Owned

What We Build

Real Cost Ranges for LA Remodeling Projects

These are honest general ranges based on Los Angeles market conditions. Your number depends on scope, existing conditions, and material selections.

Kitchen Remodel

Most common full-gut remodel in Los AngelesGas vs. Induction Cooktops in 2026

A standard LA kitchen gut-and-redo with new cabinets, countertops, tile backsplash, and appliance hookups typically runs $35,000 to $80,000 for a 150-250 sq ft space. Moving walls or adding a kitchen island pushes costs higher. Custom cabinetry adds 25-40% over stock options.

  • Cabinet layout and custom builds
  • Quartz, stone, or butcher block counters
  • Electrical, gas, and plumbing rough-in
  • Permits where required by LADBS

Bathroom Remodel

High ROI, high variation in LA pricingHow to find a bathroom remodel contractor in Los Angeles

A primary bathroom remodel with new tile shower, vanity, flooring, and fixtures runs $18,000 to $45,000 in Los Angeles. A powder room or half-bath update costs considerably less, often $8,000 to $15,000. Tile selection and plumbing relocation are the two biggest cost variables.

  • Waterproofing and tile installation
  • Custom shower surrounds and niches
  • Vanity, toilet, and fixture replacement
  • Ventilation code compliance

ADU and Garage Conversion

California's fastest-growing residential project typeADU contractor Los Angeles: a complete guide

Converting an attached or detached garage into a livable ADU typically costs $80,000 to $150,000 in LA, depending on plumbing, HVAC, electrical panel capacity, and finish level. A ground-up detached ADU runs higher, often $150,000 to $280,000. California law now allows most single-family lots to add one ADU and one JADU.

  • LADBS permit application and plan check
  • Foundation assessment and upgrade
  • New electrical subpanel and HVAC
  • Kitchen and bathroom rough-in and finish

Room Additions

Adding square footage to an existing LA home

Room additions in Los Angeles range from $200 to $400 per sq ft, all-in, depending on whether the new space requires foundation work, second-story framing, or complex tie-ins to existing structure. A 200 sq ft bedroom addition runs roughly $50,000 to $90,000 before finishes.

  • Architectural plans and structural engineering
  • Foundation, framing, roofing tie-in
  • Insulation and energy code compliance (Title 24)
  • Interior finish and exterior match

Pool Construction and Repair

A significant investment with long-term value in LA

New pool construction in Los Angeles runs $60,000 to $120,000 for a standard gunite pool with basic hardscape. Adding a spa, water features, or complex decking adds to that. Pool repair and resurfacing typically costs $5,000 to $20,000 depending on surface type and structural condition.

  • Excavation, gunite, and tile finish
  • Equipment pad, pump, and filtration
  • Permits via LA County or City Building
  • Safety barrier and fence requirements

Painting and Hardscape

Interior, exterior, and outdoor living upgradesEco-friendly home remodeling ideas for LA

Interior painting for an average 1,500 sq ft LA home costs $3,500 to $8,000 professionally done. Exterior painting runs $4,000 to $12,000 depending on stories and surface prep. Hardscape projects like concrete patios, pavers, and retaining walls typically start at $8,000 and scale with size and materials.

  • Surface prep, patching, and priming
  • Low-VOC and eco-friendly paint options
  • Concrete flatwork, pavers, and drainage
  • Retaining walls and outdoor living areas

What Moves the Price Up or Down

Site Conditions

  • Older homes often have knob-and-tube wiring or galvanized plumbing that must be brought up to code
  • Hillside lots and post-and-pier foundations add structural complexity
  • Lead paint or asbestos in pre-1980 homes requires licensed abatement

Permits and Plan Check

  • LADBS permit fees typically run 1-3% of construction value
  • Plan check for structural work adds 4-10 weeks in many jurisdictions
  • Historic districts require additional HPOZ board review

Material Selection

  • Stock cabinets vs. semi-custom vs. fully custom: price triples between tiers
  • Porcelain tile is 30-50% cheaper installed than natural stone
  • Supply chain delays on specialty orders can extend timelines by weeks

Project Phases

How a Remodeling Project Actually Works

Most homeowners have never built anything before. Here is what happens between your first call and the final walkthrough.

Timelines vary significantly by project type. A bathroom remodel can wrap in 3-5 weeks. A room addition with structural work and permits often takes 4-6 months from permit submission to final inspection. We will give you a realistic schedule in writing before we start.

G&M Home Remodeling project manager reviewing blueprints for a Los Angeles room addition
  1. 1

    Free On-Site Estimate

    We visit the property, measure the space, and talk through what you want. We ask about your budget range early because scope and budget have to match. No obligation, no pressure.

  2. 2

    Scope and Design Planning

    We put together a detailed written scope of work. For permitted projects, we coordinate with an architect or draftsman to prepare plans. We walk you through material choices and their cost differences before anything is finalized.

  3. 3

    Permits and Plan Check

    We submit to LADBS or the relevant municipality. Permit timelines in Los Angeles range from over-the-counter same-day (minor work) to 8-12 weeks for complex structural additions. We track the application and respond to corrections. The LA Department of Building and Safety publishes permit status online.

  4. 4

    Demolition and Rough Work

    Demo reveals what is actually inside the walls. This is where surprises happen: rotted framing, outdated wiring, mold behind tile. We document everything, communicate immediately, and get your sign-off on any scope changes before proceeding.

  5. 5

    Inspections Through Finish

    Rough framing, plumbing, and electrical inspections happen before walls close. Finish work follows: tile, cabinets, flooring, paint, trim, fixtures. Final inspection and sign-off close the permit. You get copies of all inspection cards.

  6. Walkthrough and Punchlist

    We walk the finished project with you and make a punchlist of anything needing adjustment. Nothing is considered complete until you sign off. We do not chase payments before work is done right.

Permits in Los Angeles

Permits Are Not Optional. Here Is What Triggers Them.

In Los Angeles, any structural work, electrical panel upgrade, plumbing relocation, or addition of conditioned square footage requires a permit. Cosmetic work (like painting or replacing fixtures in place) generally does not.

Unpermitted work creates real problems when you sell. Buyers' inspectors flag it, lenders may refuse to finance, and you may be required to demolish or legalize the work at your expense. We pull permits on every project that requires one.

Historic properties in LA with HPOZ (Historic Preservation Overlay Zone) designation face additional review. If you have an older home, check its zoning status before planning significant exterior changes. Read more about historic home remodeling in Los Angeles and how to preserve character while upgrading systems.

Projects That Always Need a Permit in LA

  • Any structural framing change or bearing wall removal
  • Electrical service panel upgrades and new circuits
  • Additions, ADUs, and garage conversions
  • Plumbing line relocation or new drain installations
  • HVAC system installations and duct modifications
  • Pool and spa construction

LA Remodeling Trends

What LA Homeowners Are Doing Right Now

ADU construction has surged since 2020. California's housing laws made it significantly easier to add a rental unit on a single-family lot, and property owners in LA are taking advantage. A converted garage can generate $1,800 to $3,200 per month in rental income in many Valley neighborhoods.

Open-plan kitchen renovations remain the most requested project. Homeowners are removing walls between kitchens and living rooms, upgrading ventilation, and switching from gas to induction as LA moves toward building electrification requirements.

Outdoor living upgrades have increased significantly since 2020. Covered patios, outdoor kitchens, pavers, and plunge pools are all up in demand. LA's climate makes outdoor space genuinely usable for 10-11 months of the year, which justifies the investment. See the modern home remodeling trends in Los Angeles for 2026 for a deeper look.

  • Energy Compliance (Title 24)

    California's Title 24 energy code applies to all permitted additions and major remodels. Insulation, windows, and HVAC specs must meet current standards. We build this into scope from the start.

  • Fire-Resistant Construction

    Homes in Very High Fire Hazard Severity Zones must use ember-resistant vents, ignition-resistant materials, and compliant roofing in any re-roofing or addition project. Many LA hillside properties fall into this category.

  • $35kKitchen Starting Point150-250 sq ft, stock cabinets
  • $80kGarage ADU ConversionAttached, basic finish level
  • $200Per Sq Ft, AdditionsGround-floor, standard finish
  • 6moTypical Addition TimelinePermits through final inspection

Common Questions

Questions Homeowners Ask Before They Hire

Straight answers to the questions we hear most. If something on your project is more complicated, call us and we will explain it.

Not sure where to start?

Tell us what you are thinking about. We will visit the property and give you a real number, not a ballpark from a phone call.

Call for a Free Estimate

How do I verify a contractor's license in California?

Go to the California Contractors State License Board (CSLB) website and search the license number. You can see whether the license is active, what classification it covers, and whether there are any disciplinary actions. Our license is #1048107. Check it before you sign any contract with any contractor.

What deposit is normal for a remodeling project in California?

California law caps initial deposits at 10% of the total contract price or $1,000, whichever is less. Any contractor asking for 30-50% upfront is either uninformed about the law or operating in a way that should concern you. Payment schedules should be tied to project milestones, not arbitrary dates.

Do I need an architect for a kitchen or bathroom remodel?

Not usually, unless you are moving walls or making structural changes. A kitchen remodel that keeps plumbing and walls in place typically does not require architectural plans in LA. A bathroom addition or layout change that involves moving the tub or toilet may need a licensed drafter to submit to LADBS. We will tell you exactly what documentation your project requires.

Can I add an ADU to any property in Los Angeles?

Most single-family lots in LA can now accommodate at least one ADU and one JADU (Junior ADU) under California state law. Local zoning can still affect setbacks, height limits, and lot coverage. Properties in hillside areas, flood zones, or with access easement issues may have additional constraints. We review the parcel before committing to a scope. See our complete guide to ADU construction in Los Angeles for the full breakdown.

How long does a full bathroom remodel take?

A primary bathroom remodel with new shower, tile, vanity, and fixtures typically takes 3 to 5 weeks of active construction. That does not include the 1-2 weeks of lead time for ordering tile and fixtures. If plumbing relocation or structural work is involved, add another week or two. Delays happen when materials arrive damaged or inspections are backed up.

Do you serve areas outside Sherman Oaks?

Yes. We work throughout greater Los Angeles including Studio City, Encino, Burbank, Glendale, Santa Monica, and the Westside. We also serve Fontana and the Inland Empire. Call us and we will confirm coverage for your address.

CSLB License #1048107

Ready to Get a Real Number for Your Project?

We visit the property, look at what is actually there, and give you a written estimate. That is how a price becomes reliable.

Estimates are free. We return calls the same day. G&M Home Remodeling has been a family-run business serving Los Angeles homeowners, and we do not take on more projects than we can manage well.

  • Free Estimates
  • Same-Day Callback
  • Licensed and Insured
  • Family-Owned
  • Starting From
    $8,000Powder Room Update

    New vanity, toilet, tile flooring, and fixtures. No structural changes. Finished in about 2 weeks.

  • Most Popular in LA
    $45,000Full Kitchen Gut and Rebuild

    Semi-custom cabinets, quartz counters, tile backsplash, new appliances. 6-8 weeks typical build time.

  • Best ROI in LA Right Now
    $110,000Garage ADU Conversion

    Full kitchen, bath, HVAC, and permitted finish. Can generate $2,000+ per month in rental income.

Free Quote