Phase One: The On-Site Assessment
The first visit is about your site, not a sales pitch. An experienced outdoor kitchen contractor will spend 30-60 minutes looking at your backyard before talking numbers.
Key things we assess during that visit: where the gas meter is located and how far a new line would need to run; whether your electrical panel has capacity for outdoor circuits; drainage slope of your patio slab; and how the space relates to your interior kitchen, dining area, and any existing structures. A backyard in Encino Hills with a 15-foot drop-off behind the patio is a fundamentally different build from a flat lot in Studio City.
We also look at HOA restrictions if applicable, setback requirements from property lines, and whether an existing concrete pad is strong enough to support a masonry island. These details determine cost and timeline more than appliance selection does.